Maintaining the ground lines in( B )Block
Maintaining the ground lines in( B )Block
In implementation of the agreement concluded between the Under-Secretary of Tripoli University for Human Sciences - B Block. Ibrahim Faeed and Director of the Office of Communications Services Ain Zara Engineer Salah Farara, where a ground communication cable of 700 meters long was withdrawn along with the installation of a of six distribution boxes and wires of 1800 meters long . The work continued for five days under the supervision of the Chairman of the blocks committee of Block B Dr. Khalid Guma. It is worth mentioning that the General Company for Communications has borne the full cost of materials. All the holes , that prevented the free entry/exit of the cars at the main gate, were filled up and settled. The movement of cars has become smooth . Moreover, the problem of frequent water breaks was, finally, solved as 2 water pumps of 10 hp were installed to supply the upper tank that feeds all the buildings of the Block as well as the residential neighbourhood adjacent to the university.
Comments